Dimplex CAB15AR Manual do Utilizador Página 6

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 8
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 5
Remote (BMS / BEMS) Operation
Connection to Building Energy Management Control Systems
(BEMS) is possible so that remote control of the air curtain can
be carried out in conjunction with other equipment.
Modular Connection
Refer to instructions provided with the modular linking kit.
Recessed Installation
Refer to instructions provided with the recess installation kit.
De-rating the unit to operate at 1/2 heat setting:
De-rating the unit to operate at 1/2 heat is done via the remote
switch unit, once the cover/facia plate is removed from the
backbox, access can be gained to the connection block inside -
for details refer to Switch Panel Instructions.
To de-rate the unit to half heat setting, insert the wire for H2 from
in with the wire for H1. By doing this the switch function will allow
half heat setting in either half or full heat mode, provided the
correct number of cores are fed to the switch unit this still allows
possible reconnection to full heat at a later stage.
At half heat setting the units detailed within the table below will
give the loadings stated.
H2 connected to H1
Model Heat Output Loading per phase
CAB10E 4.5kW 7.0A
CAB15E 6.75kW 10.0A
DAB10E 6.0kW 9.0A
DAB15E 9.0kW 13.5A
The CAB10E and CAB15E are primarily designed for 400V~ 3P&N
50Hz operation, however in the instance where it is not possible
to utilise a 3-phase supply, the CAB10E & CAB15E units can be
derated for operation via a 230V~ 1P&N 50Hz supply (please
note that in 230V~ 1P&N, a maximum loading of 1/2 heat only
will be applicable). To do this a kit will be needed please contact
Dimplex for further information.
Vista de página 5
1 2 3 4 5 6 7 8

Comentários a estes Manuais

Sem comentários