Dimplex A16M Manual de Instalação Página 21

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 40
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 20
14
Figure 22: Temperature Control screen
Figure 23: Waterside Check screen
Figure 19(c): Installer Menu with Commissioning option after
Language Selection is complete
7 Commissioning
Select ‘Commissioning’ to begin and follow the
instructions on the system controller. The
commissioning routine will take you through a
number of checks and tests to complete the
installation. When you finish using each submenu in
the commissioning process, selecting ‘Next’ will take
you back to the main Commissioning menu, where a
new submenu will be available (figure 19(c)).
7.1 General/Schematic
In some cases, it may be necessary to carry out
checks on individual components of the heating
system before beginning the commissioning routine.
Accessing General/Schematic menu allows you to set
the date and time, and the level of access allowed.
Selecting ‘Next’ will bring you to the Schematic menu,
as shown in figure 20 and 21, Once you have selected
a schematic zone diagram, a number of other options
will become available in the main Installer menu.
Please see Appendix B for full Schematic diagram
details.
7.2 Waterside check
The ‘Waterside Check’ menu allows you to select
whether temperature control is based on the flow or
return temperature, as shown in figure 22. This will
apply to heating curves, as discussed in section 7.1.9.
It is generally always recommended to set the
temperature control based on the return temperature,
unless it is necessary to use flow temperature instead
for a particular set up. Selecting ‘Next’ will bring you
to the waterside checks menu (figure 23).
A number of waterside checks must be carried out as
part of commissioning, and must be ticked as
completed in the Waterside check menu:
The system must be flushed.
The strainer must be fitted to the return pipe.
The system must be pressurized (You must
enter the system pressure).
The system must be fully bled.
The expansion vessel must be fitted
Membrane pressure must be checked and
adjusted if required.
Figure 20: General Settings
Figure 21: Schematic Menu
NOTE: Once you have completed the schematic
selection, you can access the following menus
by escaping to the upper level Installer menu:
Message log
History
Vista de página 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 39 40

Comentários a estes Manuais

Sem comentários