15
Figure 26: Electrical Connections screen
NOTE: If any changes must be made to the
commissioning configuration (e.g. selecting a
different probe), it is strongly advised that a
factory reset is performed and that the heat
pump is re-commissioned entirely. Changing
individual settings during the commissioning
process may cause commands to be ignored or
cause the heat pump to stop working correctly.
NOTE: If these steps are confirmed on the
controller during commissioning but haven’t
been carried out, any failure in the system will
be outside of warranty.
When checks are completed and ‘Next’ is selected, the
type of temperature measurement devices to be used
in each heating zone must also be selected:
User Interface (usually in zone 1 – heating
system controller)
Temperature probe (option for temperature
probe 1 to 3, for additional zones).
Mechanical thermostat (option for mechanical
stat 1 to 3, for additional zones).
Using a mechanical stat limits the level of heating
control on the zone from the UI. Heating in zones
using temperature probes can be fully controlled
using the UI.
Selecting ‘Next’ will bring you to the ‘Temperature
check’ menu.
7.2.2 Temperature Check
This screen displays the temperatures currently being
read by all thermostats. It is the duty of the installer
to ensure that all thermostats are installed and
working correctly, and the boxes on this menu should
not be ticked unless all displayed temperatures have
been confirmed to be within an acceptable, accurate
and expected range.
7.3 Electrical connections (SH)
This menu provides a list of electrical connections that
should be made prior to commissioning for space
heating. The list is based on the schematic zone
diagram selected and also the type of temperature
devices that will be used in each zone. Once you have
confirmed all checks and select ‘Next’, you will return
to the commissioning menu where you can now
access the ‘Water flow check’ menu.
7.4 Water flow check
Select ‘Run Test’ to begin water flow check. The
circulation pump will be tested first by running it for
30 seconds. When the timer reaches zero, the pump
will continue to run in 30 second bursts until flow is
confirmed, which allows time for the installer to
check that the pump is working. Once you have
checked that flow is detected, click ‘Continue’ to
confirm that the pump is working correctly. Do not
confirm that the pump is working in this menu
unless you have physically checked it, as the UI
requires your input and does not detect this
automatically.
Once this is successful, the compressor will be run for
5 minutes. As the test runs, the screen will give you
information on the status of the heat pump and the
time remaining on the test. If you do not have flow or
if there is a problem, you can stop the test.
Figure 24: Temperature Measurement Device screen
Figure 25: Temperature Check screen